Ubongo gas plant I
background
From 2003 through 2005, Tanzania experienced severe drought across the country, which reduced water levels in major hydroelectric reservoirs. TANESCO has received funds from the Government of the United Republic of Tanzania to urgently finance an emergency power generation project to bridge the power supply gap in the national grid due to drought.
TANESCO has contracted German M/S Lahmeyer International for consultancy services and has contracted with M/S Wärtsilä Company of Finland to build the 100MW owned TANESCO Gas Plat in Ubungo.
The gas plant uses locally available natural Songo Songo gas as a fuel source. The plant is equipped with twelve generating units, each with a capacity of 8.73 MW, with a total installed capacity of 104 MW. The available capacity of twelve generating units is 102.5 MW. The station is connected to the national grid through the Ubungo National Grid Substation.
Power plant operation and maintenance contract between TANESCO and WÄRTSILÄ TANZANIA LIMITED
TANESCO has entered into a two-year operation and maintenance contract with Wärtsilä Tanzania Limited. The operation and maintenance contract started on July 30, 2008. The main purpose of the operation and maintenance contract within two years is to operate and maintain the gas station and to transfer knowledge and practical training to TANESCO personnel assigned to operate and maintain the station after the operation and maintenance contract.
Opening of the power plant
The date of commercial operation of the power plant was announced on July 30, 2008, and the President of the United Republic of Tanzania, His Excellency Jakaya Mrisho Kikwete, President of the United Republic of Tanzania, inaugurated on November 4, 2008.
Power plant
The Ubongo gas plant has a capacity of 102.5 MW. Power generation commenced on July 30, 2008 for all twelve generating units.